Yokogawa EJA110A Bedienungsanleitung Seite 3

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 83
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 2
ii
CONTENTS
IM 01C21B01-01E
6.3.2 External Indicator Connection ...................................................... 6-1
6.3.3 BRAIN TERMINAL BT200 Connection ........................................ 6-1
6.3.4 Check Meter Connection.............................................................. 6-2
6.4 Wiring .................................................................................................. 6-2
6.4.1 Loop Configuration ....................................................................... 6-2
(1) General-use Type and Flameproof Type..................................... 6-2
(2) Intrinsically Safe Type ................................................................. 6-2
6.4.2 Wiring Installation ......................................................................... 6-2
(1) General-use Type and Intrinsically Safe Type............................. 6-2
(2) Flameproof Type ......................................................................... 6-3
6.5 Grounding............................................................................................ 6-3
6.6 Power Supply Voltage and Load Resistance ..................................... 6-3
7. OPERATION.................................................................................................. 7-1
7.1 Preparation for Starting Operation ...................................................... 7-1
7.2 Zero Point Adjustment ........................................................................ 7-2
7.3 Starting Operation ............................................................................... 7-3
7.4 Shutting Down Operation .................................................................... 7-3
7.5 Venting or Draining Transmitter Pressure-detector Section ............... 7-4
7.5.1 Draining Condensate.................................................................... 7-4
7.5.2 Venting Gas.................................................................................. 7-4
7.6 Setting the Range Using the Range-setting Switch ........................... 7-4
8. BRAIN TERMINAL BT200 OPERATION ..................................................... 8-1
8.1 BT200 Operation Precautions............................................................. 8-1
8.1.1 Connecting the BT200 ................................................................. 8-1
8.1.2 Conditions of Communication Line .............................................. 8-1
8.2 BT200 Operating Procedures ............................................................. 8-1
8.2.1 Key Layout and Screen Display................................................... 8-1
8.2.2 Operating Key Functions.............................................................. 8-2
(1) Alphanumeric Keys and Shift Keys ............................................. 8-2
(2) Function Keys ............................................................................. 8-2
8.2.3 Calling Up Menu Addresses Using the Operating Keys.............. 8-3
8.3 Setting Parameters Using the BT200 ................................................. 8-4
8.3.1 Parameter Summary .................................................................... 8-4
8.3.2 Parameter Usage and Selection .................................................. 8-6
8.3.3 Setting Parameters....................................................................... 8-7
(1) Tag No. Setup ............................................................................. 8-7
(2) Calibration Range Setup ............................................................. 8-7
(3) Damping Time Constant Setup ................................................... 8-8
(4) Output Mode and Integral Indicator Display Mode Setup ........... 8-9
(5) Output Signal Low Cut Mode Setup............................................ 8-9
(6) Change Output Limits ............................................................... 8-10
(7) Integral Indicator Scale Setup ................................................... 8-10
(8) Unit Setup for Displayed Temperature....................................... 8-11
(9) Unit Setup for Displayed Static Pressure .................................. 8-12
(10) Operation Mode Setup .............................................................. 8-12
(11) Impulse Line Connection Orientation Setup ............................. 8-12
(12) Output Status Display/Setup when a CPU Failure .................... 8-12
(13) Output Status Setup when a Hardware Error Occurs ............... 8-12
(14) Bi-directional Flow Measurement Setup ................................... 8-13
(15) Range Change while Applying Actual Inputs ............................ 8-13
(16) Zero Point Adjustment............................................................... 8-14
(17) Span Adjustment....................................................................... 8-15
Seitenansicht 2
1 2 3 4 5 6 7 8 ... 82 83

Kommentare zu diesen Handbüchern

Keine Kommentare