Yokogawa DO402 Dissolved Oxygen Analyzer Bedienungsanleitung Seite 77

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 98
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 76
IM 12J05D02-01E
Maintenance 7-3
How to replace the fuse
1) Before replacing the fuse, turn off power to the instrument at the external breaker.
2) Remove the instrument cover and the high-voltage shield plate.
3) Remove the cover from the fuse holder by pulling out by hand.
4) Remove the fuse and install a new, recommended or equivalent fuse on the holder.
5) Put the fuse cover back on the holder securely.
6) Install the high-voltage shield plate.
It is recommended that the fuse be replaced every two years even if it has not blown.
Shield Plate
Fuse Cover
Fuse Holder
Figure 7-1. How to replace the fuse
Seitenansicht 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 97 98

Kommentare zu diesen Handbüchern

Keine Kommentare